I wish
Itās close to the same cost as the electricity it took to run it in my apartment.
trying not to derail your question
My lab only costs me $30 a month so if you wanna go havsies we can splurge to get business fiber
is the cost of internet included?
Yeah, mine is $450 flat for 1/4 rack (11u) with 50/50 and power, although theyāve never put anyone else in the rack so I guess theyāre expecting me to expand at some point. Depending on the alleged lower rate Iām getting, I might bump bandwidth to 100/100.
Technically in the contract thereās a limit on the amperage, but theyāve never enforced it or itās never been an issue. 10 E5670s eat a lot of juice though.
So you buy/build the hardware and then they mount it?
They can do that for you for $$ but I did it myself. They thought it was cute I showed up in a van with my own dolly.
They have server lifts and kvm carts scattered around the floor that you can grab and use.
X-posting for visibility.
I can hook you up if you donāt mind janky rural Idaho infrastructure. My buildout is a few months out, but I would entertain offers.
So yesterday, I asked the DC sales rep for a quote for renewing my contact as-is as well as upgrading to 100/100. He said the base cost would be cheaper going forward. Today he emails me the 100/100 quote for $55 more per month than Iām paying now. I ask for the 50/50 quote to compare. He sends me a new 100/100 quote, now only $25 more than what Iām paying now.
I emailed him āare we negotiating? I just want to compare 50/50 vs 100/100.ā Letās see where it goesā¦
@judahnator what do you have access to in Idaho (dm me if youād like)?
I see this guy plays hard ball
Yeah, the bandwidth bump would only be a quality of life improvement, not something that would earn me more money directly, so unless itās a $5-$10 increase, Iām going to stick with 50/50.
watch, heāll lower it to $15 now
Somewhat likely Iāll never hear back and a new sales rep will reach out to me 4 months from now.
You coloing out of Joes servers ānā feed?
Also, if youāre at all suspicious, just call their front sales line and verify if the guy works there, and what his number is.
Thatās different from the last datacenter I worked with. It was for work, not for me. Anyway, they were willing to provide as many gigabit Ethernet ports as you wanted to use and/or link aggregate. Then they charged you for monthly usage. It was up to you yourself to limit and shape your bandwidth usage.
Am I supposed to know what my power draw is? I mean I could figure the theoretical maximum, but idk about actual. Heās trying to sell me on more amperage. I donāt think the PDU in the rack is smart to the point of limiting aggregate amperage over multiple outletsā¦
total up all the PSUs?
get a kill-a-watt?
Yeah thatās what I meant by theoretical max.
Their PDU does have a readout on it so they could tell me if Iām using to much. I just donāt know why Iād upgrade the power when I havenāt needed.
ā¦aaaaand itās $30 more expensive. Big surprise. Apparently Iāve been using 15A this whole time and only paying for 10A though so maybe Iāve been cheating the system the past few years.
In other news, the Google Workspace reseller that one of my clients uses was audited and is trying to charge them back sales tax going back to 2016. Oof.