Well put! This was one of the big reason Vogle went soo over budget. Obviously the design wasnât finished either.
To get things done more quickly you need to throw a lot of money or have companies not care about money as much, nuclear energy is already expensive.
The way engineering companies will just mismanage their employees and projects is part of the reason these things end up overbudget and over time. Engineering is often subcontracted to large engineering companies whose only purpose is to bill a lot of hours done by junior engineers making lots of documents and revisions.
If i see the things that fall in between the cracks of engineering dangerous things like pressure vessels (I design/calculate them for a living) I donât think i would push for less regulations on those areas.
You already see what happens if you let it go a little with what boeing is dealing with partly because they check their own work. What happens when you let companies verify their own stuff is that they cut corners, ultimately because of money of course.
sure, but do keep in mind this is true for all ~megaprojects, itâs just that nuclear power plants are unique in that they are barely built, so learning effects are difficult to benefit from. Chemical plants, refineries, wafer fabs are fairly close in terms of complexity yet the costs are much more predictable because they know how to do it and have everything ready because new builds and maintenance of the installed base are big industries.
So yeah, the cost of the next 5-10 plants will likely be pretty variable in the US, and even more so in Europe. The way to make up for those costs is to serially build 5-10 at a time all the time for a few decades.
As for the regulation affecting boeing: yeah itâs a joke. But NPPs are the most regulated industry in existence thanks to the NIMBY enviro crowd (which is funded partly by a greenwashing fossil fuel industry for predictable reasons).
Itâs not really a megaproject. And it is true for all these kinds of projects. a 5-7 year timescale for the size of this project is quick and really not all that strange. A natural gas plant also takes years from start to finish.
The same for chemical plants and refineries, which have a lot of cost and time overruns as well. Part of the reason they are somewhat predictable is standards and burocracy.
I donât like working with oil/gas companies because they have huge documentation requirements and all of their own standards to adhere to. Not specifically from external regulation but from internal rules in those companies.
as more nuclear power plants are built, it will start being more smooth even with current regulations. If a company has to deliver a 100 valves with ultrasonic testing then it will get cheaper than if they only deliver 5.
Iâve had a hard time getting stainless 316LN (with nitrogen) which is also used in nuclear and space industries, special batch orders are a lot more expensive than if its on the shelf.
Taiwan doing a Germany. Turns out it was a bad mistake.
https://www.sciencedirect.com/science/article/pii/S0306261924017495
Conclusion
The transition towards low-carbon energy sources is essential to combating anthropogenic climate change, and analyzing different pathways is paramount to addressing such a problem. This work reveals that the energy mix in future power systems can change significantly depending on how the additional load is modeled, either by scaling load by a historical profile or adding new load as baseload. Furthermore, insights is provided into how nuclear energyâs overnight construction costs impact the capacity expansion of future power systems.
âŚ
This study highlights several benefits of cost-competitive nuclear. However, achieving these goals in a European context is not trivial, given the sluggish recent history of nuclear developments and nuclear politics in Europe. Nonetheless, nuclear energy also has other valuable properties that are not fully valued in a least-cost capacity expansion model, such as low land use, local value creation, colocation with load, provision of ancillary services, and industrial heat. Therefore, paving a green transition path should be done with various decision tools, as it is incomprehensible that a single tool can paint the whole picture.
Yeah Iâm far from crazy about European countries going with modernized-overbuilt EPR designs, french nuclear plants seem designed to bring about cost overruns even if the main issue in the British case is the PPP funding structure.
Yes the last three they built was not exactly inspiring for the future of affordable nuclear.
Excluding the Russians and the Chinese leaves us mostly with Westinghouse and the Koreans.
this is what we need to resume building ffs.
To quote Obama wanted to make it happen but it got cancelled cuz our anti nuke idiots
" The project was approved in 2002 by the 107th United States Congress, but the 112th Congress ended federal funding for the site via amendment to the Department of Defense and Full-Year Continuing Appropriations Act, passed on April 14, 2011, during the Obama administration.[3] The project has encountered many difficulties and was highly contested by the public, the Western Shoshone peoples, and many politicians.[4] The project also faces strong state and regional opposition.[5] The Government Accountability Office stated that the closure was for political, not technical or safety reasons.[6]
This leaves the United States government (which disposes of its transuranic waste from nuclear weapons production 2,150 feet (660 m) below the surface at the Waste Isolation Pilot Plant in New Mexico)[7] and American nuclear power plants without any designated long-term storage for their high-level radioactive waste (spent fuel) stored on-site in steel and concrete casks (dry cask storage) at 76 reactor sites in 34 states."
I have a very hard time believing that. Itâs not a coincidence that the ânuclear renaissanceâ collapsed after he was elected.
it really wasnât him that caused the collapse. presidents rarely affect these things as much as your local politicians, state and federal
Its always local opposition if loud enough that makes the GAO push to reverse something like this
The only ânuclear renaissanceâ going on was all the hype about small micro reactors, that were either portable or someone could bury next to a manufacturing plant. Small nuclear was hyped up as the cure-all for all of nuclearâs woes, and to no oneâs surprise it was all bogus hot air claims made to lure in investment money before all of the small nuclear startups collapsed or shut down, save the one Gates kept funding.
Obama didnât kill nuclear, nor was Obama responsible for the two major nuclear plant expansion projects that fell through that I remember. Nor was he responsible for Westinghouse imploding under its own greedy weight. When adding two plants to an existing two reactor facility is billed as costing $10 billion, then that cost doubles to $20 billion before they even break ground, maybe itâs not a political problem but a greedy corporate capitalistic one. The first $10 billion estimate already included $3 billion in financing costs. Nuclear will never be feasible when it costs $15b to build and $6b+ to finance. Itâs no different than a consumer making $36K a year buying an $800,000 house. Nearly all of their monthly mortgage payments only pay for the interest, not the base capital investment. Electric utilities donât earn big fat wads of money to be able to pay down billions in debt interest payments very quickly.
Want 24/7 clean energy to your data center? Go nuclear or go home.
Oracle as wellâŚ
https://www.modernpowersystems.com/news/data-centre-powered-by-three-smrs-to-be-built/.
Regards
Iâm pro this decision.
encouraging nuclear power by corporations will help make it more palatable for everyone else. and encourage more research and development.
Great, this will be the ultimate litmus test. If these companies can get Nuclear working for them, awesome. If not, this is one of the final nails in the coffin for Nuclear as a profitable power generator.
There are other reasons to keep nuclear afloat, but it sure helps if it can stay profitable
I am also for this decision as it will show only cold, hard data in the end.
This is WAY off base. There absolutely WAS a nuclear renaissance going on, and I was brought up IN it. It wasnât the small modular buzzword driving it (no argument there) with small startups, it was the commercial power industry eager to build gen III reactors. Vendors and operators were recruiting like MAD.
Iâm not trying to suggest obama personally took direct action to shut down new nuclear, but he and more broadly his party were cold to it while his opposition made it a campaign item. For nuclear, playing in the highly regulated (before you even factor in the ânuclearâ part) energy/utilities sector and facing a significant PR challenge from misguided (or dishonest and malicious) âenvironmentalistsâ, the cold shoulder from the government can be the death sentence.
well, that and essentially free nat gas from fracking (with the nat gas lobby funding the âenvironmentalistsâ), yeah.