Looking to back away from the minisforum MS-01 for my Proxmox cluster running 3 Kubernetes nodes, the mixed performance/efficiency core stability is not ready (imho)
workload:
- all the *arrs
- plex
- github action worker nodes running docker builds during business hours all week!
setup:
- Intel Core i9-13900H
- 1x nvme (https://www.amazon.com/dp/B09QV5KJHV),
- 2x 48GB RAM (https://www.amazon.com/dp/B0C79T2CP7)
I went through several debugging cycles to stabilize the system: https://forums.servethehome.com/index.php?threads/minisforum-ms-01-i9-13900h-96gb-with-proxmox.43380/post-425708 (user makyz) but with little luck. To summarize:
- checked the RAM
- updated microcode
- disabled efficiency cores
- disabled c states
- flashed BIOS
tried all permutations and my longest run was 3 days with very light utilization
(yes I watched all the popular videos on the topic etc https://www.youtube.com/watch?v=IiwD8kcjD98)
So the TLDR; I am looking to swap this out with another server to run the same workloads, I thought I would get up to five MS-01s if the first one worked out, so I am willing to go any direction with this as long as it isn’t any louder than my hl-15 (i jammed noctua fans into that sucker), and can fit on top of it 5 feet away from my desk.
definitely a victim of the youtube ms-01 hype train, but gotta get past it!
I saw @wendell recommend something that I thought could work in this thread: Planning Threadripper 7000 Build - No Kill like Overkill - #3 by wertigon
I could go in for a couple of those, probably would grab another hl15 chasis, love the look!
Appreciate any help and let me know if I left out important details!