right so i have a intel i5 build (http://pcpartpicker.com/uk/p/sjNL) but i have been told to not get windows and download one from the internet is that safe and since ill have to wait till march to get the money i need (£910) would it be beneficial to wait till june/july till the haswell drops
link to a post about haswell:http://www.anandtech.com/tag/haswell
http://www.maximumpc.com/article/news/rumor_leaked_chart_details_desktop_haswell_cpu%E2%80%99s_slated_q2_2013_release
any help is appreciated